diff options
author | John Crispin <john@openwrt.org> | 2015-03-06 07:57:03 +0000 |
---|---|---|
committer | John Crispin <john@openwrt.org> | 2015-03-06 07:57:03 +0000 |
commit | 57c7bed820edc45d59575c82d1bfd30cacf38395 (patch) | |
tree | da8a248614c1607e67e52a42ca2e489e2c132e00 /target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch | |
parent | 3ddd2b49a9c59d0b7a1b73bdc177d4f294beb526 (diff) | |
download | mtk-20170518-57c7bed820edc45d59575c82d1bfd30cacf38395.zip mtk-20170518-57c7bed820edc45d59575c82d1bfd30cacf38395.tar.gz mtk-20170518-57c7bed820edc45d59575c82d1bfd30cacf38395.tar.bz2 |
swconfig: fix build with linux 4.0
Signed-off-by: Álvaro Fernández Rojas <noltari@gmail.com>
SVN-Revision: 44617
Diffstat (limited to 'target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch')
0 files changed, 0 insertions, 0 deletions