summaryrefslogtreecommitdiff
path: root/target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch
diff options
context:
space:
mode:
authorJohn Crispin <john@openwrt.org>2015-02-11 10:09:23 +0000
committerJohn Crispin <john@openwrt.org>2015-02-11 10:09:23 +0000
commit88ddb3746188037afd38d631f7a893587fa8bdf0 (patch)
treedf4684db63441435126c4b6ff1fda4ce615e1ff0 /target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch
parentddcbef5766fa18f52e7a7d1928b25edc63e73937 (diff)
downloadmtk-20170518-88ddb3746188037afd38d631f7a893587fa8bdf0.zip
mtk-20170518-88ddb3746188037afd38d631f7a893587fa8bdf0.tar.gz
mtk-20170518-88ddb3746188037afd38d631f7a893587fa8bdf0.tar.bz2
ipq806x: update target to v3.18
Patches in the ipq806x/patches folder were out of tree in v3.14. The newest patch at the time was from June, so we can safely assume that either the patches have been merged, or they have been rejected for a good reason. If patches are seen missing, we'll cherry-pick them on a per-needed basis. This new kernel have been tested on AP148, which seems to works fine. Signed-off-by: Mathieu Olivari <mathieu@codeaurora.org> SVN-Revision: 44386
Diffstat (limited to 'target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch')
0 files changed, 0 insertions, 0 deletions