diff options
author | John Crispin <john@openwrt.org> | 2015-03-06 07:56:34 +0000 |
---|---|---|
committer | John Crispin <john@openwrt.org> | 2015-03-06 07:56:34 +0000 |
commit | f04a268a043f8a2a7bfde79f7ca3e49718055798 (patch) | |
tree | 6ee12035b89bbc69007064935ae9ef4a26280fc6 /target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch | |
parent | fa097e5ae5fddb82a077a0bb1676a512fa2d908e (diff) | |
download | mtk-20170518-f04a268a043f8a2a7bfde79f7ca3e49718055798.zip mtk-20170518-f04a268a043f8a2a7bfde79f7ca3e49718055798.tar.gz mtk-20170518-f04a268a043f8a2a7bfde79f7ca3e49718055798.tar.bz2 |
kernel: disable ARCH_NEEDS_CPU_IDLE_COUPLED
Disable ARCH_NEEDS_CPU_IDLE_COUPLED by-default in generic config, since
only one platfrom (omap) needs them.
Signed-off-by: Sergey Ryazanov <ryazanov.s.a@gmail.com>
SVN-Revision: 44614
Diffstat (limited to 'target/linux/brcm2708/patches-3.18/0105-dwc_otg-fixup-read-modify-write-in-critical-paths.patch')
0 files changed, 0 insertions, 0 deletions